We worked on more of the firewall forward tasks today. We had intended to fit the lower canopy around the exhaust but got side-tracked by the Half Raven kit. It doesn’t look too hard but it took the better part of a day to complete it.
The hoses from AS Flight Lines were perfect (again). Steve also helped me to figure out how to install the entire setup despite being on a camping trip.
![](http://www.brucelan.com/wp-content/uploads/2020/09/IMG_2325-768x1024.jpg)
We installed the Sniffle Valve. It took way longer to figure out where it goes then it does to install it.
![](http://www.brucelan.com/wp-content/uploads/2020/09/IMG_2311-768x1024.jpg)
We installed the oil dip stick. Short, easy job.
We gapped and installed all the sparkplugs (after I searched high and low for the 18mm to 14 mm adapters. I finally found them upstairs by my desk. Glad I did, replacing them would be $100.
Tomorrow is moving day. We will be going to get the wings which have been in storage in Williamsburg and bring them to my hanger. I will also bring the tail too. If I get really ambitious I will bring the whole project to the hanger (30% likelihood).
16 hours (2 people x 8 hours).