My father and I installed the engine mount. Six bolts (three different lengths). Only a small amount of reaming necessary to get the bolts in. Had to search for the AN1149FO632P washers called out for the top two bolts. Had a slight interference issue with one firewall item.
Began fabrication of the main gear leg components.
Two hours (Two people x 1 hour).